Quantcast
Channel: Pdf Repair Manual Download » mass air flow
Viewing all articles
Browse latest Browse all 8

2005-2006 Toyota Tundra/ Sequoia 4.7L V8 MR Tech Power-flow Intake system Installation Manual

$
0
0

download
The installation of this cold air intake does require mechanical skills. Removal of engine covers, air lines and removing several plastic plugs and screws that may be difficult. It is recommended that this system be installed by a professional mechanic. Be sure to disconnect the negative terminal before proceeding. Congratulations! You have just purchased the worlds first tuned intake system. MR Technology, Leading the way! Patent pending (A) and (G) (B) (D) (A) Power-Box contents: POWER-FLOW: An air intake evolution Tools required: 1- 8mm socket 1- 10mm socket 1- 12mm socket 1- Phillips screw driver 1- 8mm nut driver 1- 55mm allen wrench 1- Disc grinder or Dremel (C) (E) Figure 1 Figure 2 Carefully, remove the mass air flow sensor from the air sensor housing to be reused later in the instruc- tions. Unhook three spring clamps from the top air box cleaner. Once the hooks have been removed, continue to detach the air box top from the lower air box cleaner. See fig. 15 for better illustration. Once the nut and bolt have been removed, continue to remove the entire hose clamp. Unplug the electrical harness clip from the mass air flow sensor as shown above. Disconnect the 4mm vacuum line located to the side of the air box cleaner. Unscrew the nut and bolt the hose clamp that secures the hose over the radiator. Loosen the two flange nuts on the engine cover in order to remove the cover. Disconnec the 6mm vacuum hose that will be reused later in the instructions. Page 2 of Part# PF2019 Unscrew the two screws from the mass air flow sensor, shown above. Loosen the hose clamp on the air duct connected to the throttle body. Unplug the crank case breather hose from the air crank case port as shown above. >>> >>>> Figure 3 Figure 8 Figure 7 Figure 6 Figure 11 Figure 10 Figure 9 Figure 14 Figure 13 Figure 12 >>>> Figure 4 Figure 5 Once the flange nuts have been removed, continue to remove the cover from the engine compartment as shown above. >>> >>> >>> >>> >>> >>> The three spring clamps shown above are unhooked from the top air box cleaner (A). Remove the air filter panel once the top has been removed (B). Once the air filter panel is removed, there are three bolts that will be removed in order to detach the lower air box cleaner. Remove the entire lower air box cleaner from the engine compartment. Place the power bands over each end of the silicone elbow. press the short end of the silicone elbow over the throttle body. Once the silicone elbow has been aligned continue to semi-tighten power band over the throttle body end. The first vibra-mount is aligned to the pre-tapped hole located behind the head lamp. The first vibra-mount is now installed as shown above. Screw the second vibra-mount is aligned over the wheel well bracket. The second vibra-mount is now installed as shown above. The stock 6mm hose is removed from the fuel pressure regulator. Press the new 16″- 4mm vacuum hose over the fuel pressure regulator port. Page 3 of Part# PF2019 Figure 15 Figure 17 Figure 16 Figure 20 Figure 19 Figure 18 Figure 23 Figure 26 Figure 25 Figure 22 Figure 21 Figure 24 (B) (A) (A) (A) >>> >>> >>> >>> Both vibra-mounts are now installed, you are now ready to go on to the next step. Place one .462 and a .412 power band over the silicone step hose. Press the 3 3/4″ side over the velocity stack as shown above. The Power box is now sitting flush over the vibra- mounts and a fender washer is placed over each vibra-mount. The last m6 flange nut is placed over the vibra- mount located behind the Power box. The 65mm bolt is tightened with an allen wrench. The assembled power box is lowered into the engine compartment. Align the mounting points on the bracket arms over the vibra-mounts. One 45mm bolt is removed from the top of the box. The bracket is place under the Power box and the 45mm bolt is aligned and screwed back in place as shown above. Remove the 65mm bolt from the velocity stack base. Align the bracket to the hole and insert the 65mm bolt back in place


Viewing all articles
Browse latest Browse all 8

Trending Articles